Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 28 results ...

Abeytunga, P K (1978) The role of the first line supervisor in construction safety: the potential for training, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Albarkoly, K (2017) Exploring the maintenance practices and strategies in the Libyan cement industry, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

Allenby, V R (1986) Cost models for engineering services, Unpublished PhD Thesis, Department of Civil Engineering, Aston University.

Alqubaisi, S (2019) Developing a framework to assess the portfolio governance, risk and compliance of Abu Dhabi Government entities in the UAE, Unpublished PhD Thesis, , Aston University.

Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes, Unpublished PhD Thesis, , Aston University.

Berny, J (1988) Forecasting and risk analysis applied to management planning and control, Unpublished PhD Thesis, Aston Business School, Aston University.

Byrd, R H (1981) The mathematical modelling of the environmental performance of buildings as an aid in the design process, Unpublished PhD Thesis, , Aston University.

Callcott, A E (1985) Microcomputers for civil engineering consultancy in developing countries, Unpublished PhD Thesis, , Aston University.

De Garay, A (1982) Evaluation of public housing strategies in Mexico City: an exploratory goal programming approach, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Eke, G (2017) Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

El Bakry, S M (1981) Measurement of productivity and cost of the direct labour organisation within highways maintenance departments, Unpublished PhD Thesis, , Aston University.

  • Type: Thesis
  • Keywords: highways; maintenance; productivity; interview; questionaire survey
  • ISBN/ISSN:
  • URL: https://publications.aston.ac.uk/id/eprint/15072/
  • Abstract:
    The objective of this thesis is to investigate, through an empirical study, the different functions of the highways maintenance departments and to suggest methods by means of which road maintenance work could be carried out in a more efficient way by utilising its resources of men, material and plant to the utmost advantage. This is particularly important under the present circumstances of national financial difficulties which have resulted in continuous cuts in public expenditure. In order to achieve this objective, the researcher carried out a survey among several Highways Authorities by means of questionnaire and interview. The information so collected was analysed in order to understand the actual, practical situation within highways manintenance departments, and highlight any existing problems, and try to answer the question of how they could become more efficient. According to the results obtained by the questionnaire and the interview, and the analysis of these results, the researcher concludes that it is the management system where least has been done, and where problems exist and are most complex. The management of highways maintenance departments argue that the reasons for their problems include both financial and organisational difficulties, apart from the political aspect and nature of the activities undertaken. The researcher believes that this ought to necessitate improving the management's analytical tools and techniques in order to achieve the most effective way of performing each activity. To this end the researcher recommends several related procedures to be adopted by the management of the highways maintenance departments. These recommendations, arising from the study, involve the technical, practical and human aspects. These are essential factors of which management should be aware - and certainly should not neglect - in order to achieve its objectives of improved productivity in the highways maintenance departments.

Flanagan, R (1980) Tender price and time prediction for construction work, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Haghdadi, H (1989) The role of micro computers on the construction site, Unpublished PhD Thesis, Department of Civil Engineering, Aston University.

Izzat, R M (1977) A computerised approach to bidding strategy in civil engineering, Unpublished PhD Thesis, , Aston University.

Jesson, J K (1988) Ethnic minority builders: a comparative study of Britain and the United States of America on affirmative action in the building industry, Unpublished PhD Thesis, Aston Business School, Aston University.

Johnston, J O D (1975) Development of a computerised library system in the construction industry, Unpublished PhD Thesis, , Aston University.

Jones, A M (1990) Design and construction for traditional house building, Unpublished PhD Thesis, Department of Civil Engineering, Aston University.

Kim, K (2015) Conceptual building information modelling framework for whole-house refurbishment based on LCC and LCA, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

Kotula, M (2013) Development of a risk-oriented strategic sourcing framework for the construction and electronics manufacturing industries, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

McLeish, D C A (1978) House building productivity: A study of labour requirements on Scottish house building sites using activity sampling methods, Unpublished PhD Thesis, , Aston University.

Nayfeh, M (1989) A combination of cyclone and vert techniques for the management of construction projects, Unpublished PhD Thesis, Department of Civil Engineering, Aston University.

Panopoulos, G D (2003) Economic aspects of safety in the Greek construction industry, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

Parker, M A (2022) Developing a performance index to measure soft skills on construction projects: a Delphi study, Unpublished PhD Thesis, , Aston University.

Peckitt, S J (2001) Construction industry safety culture: a comparative study of Britain and the Caribbean, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

Prabhu, S P (1980) Effective tendering for large scale overseas turnkey projects, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Sidwell, A C (1982) A critical study of project team organisational forms within the building process, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Skinner, D W H (1979) An analysis of the utility of bills of quantities in the process of building contracting, Unpublished PhD Thesis, , Aston University.

Thannon, A Y (1989) The appraisal and management of multistorey dwelling blocks using large concrete panel systems, Unpublished PhD Thesis, , Aston University (United Kingdom).